Project Description

In June 2022, Arkhadaya, as part of Syntek Group, successfully completed the Engineering, Procurement, and Construction (EPC) of a 160 kWp Off-Grid Solar Power Plant in Watu Mute Village, Kotakomba District, East Manggarai Regency, East Nusa Tenggara.
This project complements the earlier 230 kWp Nanga Meje Off-Grid Solar Power Plant, further strengthening Arkhadaya’s commitment to expanding renewable energy access across Indonesia’s remote regions.

The power plant is equipped with a 324 kWh battery energy storage system, ensuring a stable and reliable power supply for the local community. Integrated with the Syntek EMS Box 2.0 — an Energy Management System developed by Syntek, the system efficiently regulates and monitors the solar plant’s operations to maintain optimal performance.

For the residents of Watu Mute, this off-grid solar installation serves as their first and only source of clean, sustainable energy, significantly improving the village’s quality of life and productivity.

Through this project, Arkhadaya takes pride in contributing to Indonesia’s national energy transformation, empowering communities in 3T (frontier, outermost, and disadvantaged) areas with reliable, clean, and renewable electricity.

Project Detail

LOCATION
NTT

CLIENT
PT PLN (Persero)

PROJECT DURATION
2022