Project Description
Arkhadaya (part of Syntek Group), in collaboration with PT Bakrie Power and PT Dipa Jaya Sejahtera, successfully completed the integration of a 1.3 MWp Hybrid Solar Power Plant located in Parak Village, Bontomanai District, Selayar Regency, South Sulawesi.
This landmark project stands as PLN’s largest hybrid solar power plant in Indonesia, marking a major milestone in the nation’s journey toward renewable energy transformation.
The system integrates Solar PV, a Battery Energy Storage System (BESS), and Diesel Generators, operated seamlessly through RTU- and SCADA-based automation technology. This configuration ensures precise power balancing and system stabilization, maintaining reliability and efficiency even amid varying energy demands and solar conditions.
With this advanced hybrid control system, the people of Selayar Island can now enjoy reliable and cleaner energy, reducing diesel fuel dependency while enhancing power stability across the grid.
As a trusted EPC partner in complex energy integration, Arkhadaya is proud to contribute engineering excellence to hybrid renewable system integration within PLN’s national network. We remain committed to supporting the government’s clean energy agenda, accelerating renewable adoption, and driving sustainable development across Indonesia.
Project Detail
LOCATION
Selayar
CLIENT
PT PLN (Persero)
PROJECT DURATION
2022
