Project Description

Arkhadaya (formerly Syntek Otomasi Indonesia), in collaboration with PT Masdar Mitra Solar Radiance, has successfully completed the installation of a 573.4 kWp rooftop solar power system for a company operating in the steel manufacturing industry, located in Tangerang, Banten.

This project encompassed engineering, procurement, construction, installation, as well as an operations and maintenance (O&M) contract for a 500 kWac photovoltaic system, which was officially handed over on November 26, 2024.

Utilizing 622 solar modules, the system is capable of generating 795,306 kWh of clean energy annually, reducing carbon emissions by up to 620 tons of CO₂ per year — equivalent to the annual carbon absorption of 28,456 mature trees.

The implementation of this solar PV system represents a significant step for the steel industry in enhancing energy efficiency while strengthening its commitment to sustainable industrial practices in Indonesia.

As a trusted EPC partner, Arkhadaya continues to innovate in delivering efficient, reliable, and environmentally friendly solar energy solutions for various national industrial sectors.

Project Detail

LOCATION
Tangerang

CLIENT
PT Masdar Mitra Solar Radiance

PROJECT DURATION
2024

Share is caring