Project Description
Arkhadaya, in collaboration with PT TotalEnergies Eneos Renewables Indonesia Project (TERIP), has successfully completed the installation of a 1,534.68 kWp rooftop solar power system at the production facility of PT Parkland World Indonesia in Rembang, East Java.
Through the Engineering, Procurement, and Construction (EPC) scheme, Arkhadaya took full responsibility for the system’s design, procurement, and installation, utilizing 2,646 solar modules with a capacity of 580 Wp each. The project was officially handed over on September 18, 2025.
The solar PV system is projected to generate 2,360.18 MWh of clean energy annually and reduce carbon emissions by up to 1,660 tons of CO₂ per year—equivalent to the annual carbon absorption of 76,161 mature trees.
The implementation of this solar energy system marks a concrete step by PT Parkland World Indonesia in improving energy efficiency and strengthening its commitment to sustainable manufacturing practices in Indonesia.
As a trusted EPC partner, Arkhadaya remains committed to delivering efficient, innovative, and environmentally friendly large-scale solar energy solutions to support the realization of a greener industrial future in Indonesia.
Project Detail
LOCATION
West Java
CLIENT
PT Parkland World Indonesia
PROJECT DURATION
2025
