Project Description

Arkhadaya, in collaboration with PT Centra Multi Elektrindo, has successfully completed a 60 kWp Rooftop Solar Power Plant project at PLN’s 150kV Kubu Substation in Bali.

The project included the installation of a rooftop PV system, along with an integrated monitoring and control system, which was officially handed over on March 13, 2025.

Comprising 140 solar modules, the system has been operating efficiently and stably since its energization on January 21, 2025. Through this initiative, the PLN electricity network in the Kubu area now harnesses solar energy to support the transition toward a more environmentally friendly power infrastructure, with a significant potential for carbon emission reduction — equivalent to the annual carbon absorption of hundreds of mature trees.

This project marks a concrete step by PT PLN (Persero) in reinforcing its commitment to clean energy transition within Indonesia’s national electricity sector.

As an experienced EPC partner, Arkhadaya continues to support the development of clean energy systems across Indonesia — spanning industrial, research, and power infrastructure sectors.

Project Detail

LOCATION
Bali

CLIENT
PT Centra Multi Elektrindo

PROJECT DURATION
2023