Project Description
Arkhadaya, as part of Syntek Group, played an active role in the development of a 13.5 MWp / 10 MWac Solar Power Plant located in Indonesia’s new capital city, Nusantara (IKN), Sepaku, East Kalimantan. This strategic project supports IKN’s vision of becoming a forest city that is environmentally friendly and powered by renewable energy.
Built on a 12-hectare site, Arkhadaya successfully completed a comprehensive Engineering, Procurement, and Construction (EPC) scope, including PV module installation, mounting systems, lightning protection, street lighting, MV switchgear, transformer installation, emergency generator setup, pre-commissioning, and commissioning.
With a total of 21,600 photovoltaic (PV) modules, the project was completed on schedule despite challenges such as limited road access and minimal supporting infrastructure at the site.
This solar power plant represents a major milestone in supplying green electricity to the Nusantara Capital area and serves as a symbol of Indonesia’s commitment to sustainable development.
Arkhadaya takes pride in contributing to this national strategic initiative and remains dedicated to driving innovation and renewable energy solutions that support the realization of a greener and more sustainable future for Indonesia.
Project Detail
LOCATION
IKN
CLIENT
PLN Nusantara Power Services
PROJECT DURATION
2024