Project Description

In collaboration with Xurya, Arkhadaya, as part of Syntek Group, successfully completed the Engineering, Procurement, and Construction (EPC) of a 6 MWp Rooftop Solar Power System at a leading FMCG company located in Karawang, West Java.

The on-grid solar PV system, consisting of 13,240 photovoltaic (PV) modules, is projected to generate an additional 8,355 MWh of clean electricity annually, optimizing daytime energy consumption and improving overall operational efficiency.

Beyond reducing electricity costs from PLN, this solar power installation is expected to cut carbon emissions by approximately 6,517 tons of CO₂ per year, reinforcing the client’s commitment to sustainable, green energy adoption in industrial operations.

As a trusted EPC partner, Arkhadaya continues to support the growth of Indonesia’s renewable energy sector by delivering reliable, efficient, and sustainable solar power solutions that accelerate the transition toward eco-friendly and future-ready industrial zones.

Project Detail

LOCATION
Jawa Barat

CLIENT
Xurya

PROJECT DURATION
2024

Share is caring